Commissioning of the more powerful turbine

Sustainable power generation at the TIB sulfuric acid plant has been running stably since June!

In May of this year, a more powerful turbine was commissioned. After the control system was optimized and various performance tests were carried out, the final acceptance took place in June. Since then, power generation in the sulfuric acid plant has been running more effectively and energy demand has decreased. In addition, the turbine drives the plant's feedwater pump.The potential annual CO2 saving is 608 tons.

Another step towards reducing our CO2 footprint!